Skip to content
Office, Monday – Friday: 8 a.m. – 5 p.m.Business registration · MI Registration 000000VerifyGeneral liability insurance, $1M per occurrence, $2M aggregateWorkers' compensation insurance, statutory limits
2 more licenses
  • Business registration · MI Registration 000000Verify
  • General liability insurance, $1M per occurrence, $2M aggregate
  • Workers' compensation insurance, statutory limits
RFP desk(313) 555-0101

How the number is built

What moves the number

We price each building from these six facts, and the bid shows them so you can see why it differs from another supplier's.

  • Area and surface

    Square feet of each floor type: carpet, resilient tile, sealed concrete and stone each take a different crew time.

  • Frequency

    Nightly, three nights a week or weekly. Frequency changes crew time more than size does.

  • Fixtures and use

    The count of restroom fixtures and how many people use the building drive restroom time.

  • Access window

    Hours when we can be in the building. A short window needs a bigger crew.

  • Supplies

    Whether you provide paper, liners and soap, or we do, and which products your policy lists.

  • Requirements

    Background checks, badge rules, wage rules and training your solicitation sets.

Reading the bid

What the bid includes, and what is priced apart

A bid that mixes everything into one total can't be compared. Ours separates the lines.

What the bid includes, and what is priced apart
Priced as its own lineIncluded in the bid
Crew labor and supervisionPriced as its own lineNot a separate lineIncluded in the bidIn every bid
Cleaning products and equipmentPriced as its own lineA named product if your policy requires oneIncluded in the bidIn every bid, from the list in your scope
Paper, liners and soapPriced as its own lineA separate line if we buy themIncluded in the bidIncluded only if your scope says we supply them
Floor care and periodic projectsPriced as its own lineEach its own lineIncluded in the bidListed with a date in the bid
Added days and eventsPriced as its own lineBilled when you askIncluded in the bidRates in the bid

When you get what

When the number arrives

The price is not given on a call or before the walk-through. It comes in writing, by your due date.

  1. 01

    Step 1: By the end of the next business day

    We acknowledge the solicitation and name the owner of the response.

  2. 02

    Step 2: Inside your question window

    We send written questions so every bidder gets the same answers.

  3. 03

    Step 3: At the walk-through

    We measure and photograph the areas, with your permission, and note access limits.

  4. 04

    Step 4: By your due date

    The written bid, in your required form, with the packet attached.

  5. 05

    Step 5: After award

    A transition plan before the first shift: keys, badges, supplies and the first-week walk.

Questions on pricing

Do you give a ballpark before the walk-through?

No. A figure given before we have seen the building would be a guess, so the number comes in the written bid.

Can you price to a form we provide?

Yes. If your solicitation attaches a pricing form, we fill it in and attach our scope sheet beside it.

What if your number differs from another bidder's?

Ask for the scope sheet. Most differences are frequency, supply and floor care lines, and the sheet shows which.

Walk a site with us

Send the solicitation or the site list, and the RFP desk books the walk-through.